well idk why i bother to keep updating since nobody reads this anyways aha but i guess ill just do a update, i got all my stuff back from the machine shop, had my rods fitted to my pistons and shot peened, had the arp rod bolts installed, had the block cleaned and honed, have the head inspected, got a valve job and resurfaced, and my crank was micropolished. ill be slowly assembling it the next few weeks, still need a few things like a oil pick up. i also sold my coilovers for 350 plus a rywire tucked harness and turned around and traded the harness for a b16 trans. and then in the next few days ill be trading my stupid 3in exhaust for some itr dual valve springs to make my head even better! getting super excited to finally have it done!
also i picked up some 92-95 eg front brake lines and a da proportioning valve and deleted my abs! still need to hook up my master cylinder lines